permanent vehicular bridge

Permanent Vehicular Bridges

Tailored to Customer Requirements

 

Bridge for Recreation

68’ bridge designed primarily for snowmobile use but also forestry and firefighting access.

Municipal Bridge

34’ bridge utilized in conjunction with GRS abutment system on township road..

Municipal Bridge

35’ bridge installed on township road.

Forestry Bridges

50’ bridge installed for access to large timber tract.

Forestry Bridge – Before

Before and after photos of 60’ permanent bridge set on new timber sills behind existing abutments. Construction took less than three days including removal of existing superstructure and center pier, excavating/setting timber sills, and installation of new bridge.
This photo shows bridge to be replaced. ..See next

Forestry Bridge – After

Before and after photos of a 60′ bridge that was set on new timber sills behind existing timber abutments. The installation took less than three days including removal of existing bridge and center pier. Project was located in the Adirondack Region of New York. Here… new bridge from ADM Welding & Fabrication, LLC

Forestry Bridge

110’ multi-span bridge providing permanent access to timber tract and recreational areas.

Forestry Bridge

Three bridges, two 55’ & one 50’, installed on existing piers with new concrete caps.

Mining Bridge

45′ bridge with asphalt overlay installed at mine entrance.

Mining Bridge

Two-lane 60’ long bridge.  Removal of existing bridge and installation of new bridge was phased to maintain one operational lane of traffic at all times.

Pipeline Bridges

60’ bridge with galvanized finish providing access to meter station

Oil & Gas Bridge

50’ bridge providing well pad access. Photo 1

Oil & Gas Bridge

50′ bridge providing well pad access. (Photo 2)

Oil & Gas Bridge

60’ bridge providing well pad access.

Oil & Gas Bridge

60’ bridge providing well access.

    • Permanent Vehicular Bridges

      • Designed/fabricated to order in nearly any width, capacity, and lengths up through 100’.
      • Lower purchase price than a comparably sized portable bridge.
      • Treated timber deck system, typically 6” thick.
      • Minimal installation time compared to traditional stick-built bridges…
        • Typically less than one day for single-lane bridges under 70’ long.
        • 2-3 days for bridges over 70’.