Long Span Temporary Bridge

Long-Span Temporary Bridges

Modular Solution for Longer Crossings

Oil & Gas

80’ bridge providing “long-term temporary” access to shale gas pad site.

 

Oil & Gas

80’ bridge providing “long-term temporary” access to shale gas pad site.

 

Long-Span Temporary Bridges

  • FEATURES…
    • For lengths from 75′ through 100′.• Typically install in 2-3 days with 4 laborers plus equipment/operators.