Hybrid Portable Bridges  

  • Used instead of the hinged bridges in the following situations:

    • Desired width is greater than can be accommodated with the hinged bridges.

    • Structure dimensions/weight necessitates that the bridge be transported as multiple loads.

    • Desired guardrail system is more elaborate than can be accommodated with the hinged bridges.

    • Desire to reduce pick/handling weight.

  • Consist of partial-width by full-length modular units [with guardrail and deck pre-installed] that bolt together.

  • Feature tapered ends, heavy-duty towbars, and additional reinforcing to withstand the rigors of installation at multiple sites and to facilitate handling with excavating/forestry equipment.  Bridges can be “skidded” [pushed/pulled] for significant distances.

  • Can be designed/fabricated to nearly any width, capacity, and lengths up through 70’.  Refer to rental pricing page for “stock” sizes.

  • Also suitable for permanent installations.

14' x 70' temporary bridge for pipeline construction project.

 

 



14' x 60' temporary bridge for electrical transmission line project.

 

 


 

15'x55' bridge used as temporary bypass during bridge replacement project